Design sign-off
Part and mould design, design-for-manufacturability and mould-flow simulation, approved before anything is tooled. Nothing is cut until the sign-off is issued.
Tooling
The mould is cut here, prototype to hard tool, and proven on trial before it runs. The company that cuts the tool is the company that moulds the part.
Validation
We test materials and finished parts against the agreed specification. The quality and regulatory documents are written as we go, not assembled at the end.
Production
Assembled, leak-tested, packed and sterilised inside an ISO Class 7 and 8 cleanroom, classified to ISO 14644-1, with stage QC at each step.
Dispatch
Released against the batch record and shipped with its inspection reports. The documents that travel with the goods are the ones you saw at the start.
Ask for all six before you travel.
We provide full documentation ahead of your site visit so your quality and regulatory teams can audit our protocols before boarding a flight.